Rating lives in the header
The load-rating field is text so “2000 lbs/level” or a metric equivalent can be copied from the beam sticker without a unit converter in the form.
Inspectors scoring a bay enter rack identity and the posted load rating, then mark uprights, beams, locking pins, rust that affects structure, load versus rating, aisle clearance, and whether capacity labels are still readable.
This is an operational checklist you can embed. It is not a certified safety program or legal advice. Match items to your site rules before you rely on a signed record.
The load-rating field is text so “2000 lbs/level” or a metric equivalent can be copied from the beam sticker without a unit converter in the form.
Missing beam connectors are their own Fail path with a required note, because a tidy aisle can still hide an unlocked beam.
No. It is a visual and posted-rating check. Engineering capacity is a different document.
Use the inventory damage report if you need a picture field. This checklist is status rows plus notes.
No. Only the inspector signature is required on this template.